Been doing another urban infill job today here is a quick picture of the grading so far. Four building platforms in a gully with a driveway down the side and retaining walls all over the place.
Modelled with a corridor for the drive, featurelines break lines for the retaining walls and ETW from the corridor.
No comments:
Post a Comment